South Staging Back Tracks Installed.
Well the South Staging (Lower Staging) is starting to take shape with the Back 5 dead-end staging are in, but this staging is set up so that train back into the tracks ready to go again.
The Main South Line Layout is based on the Main South Line in New South Wales (Australia) which runs from Sydney to Albury. I and Modelling parts of the Line from between Sydney to Junee.

The Photo Shows Area for Goulburn Loco has been worked out and the turntable is now in position with a 44 Class showing one of the storage roads. The Round house will only be the back half as I do not have the room for a Full Round house and also so it can be see and Operated from the front also you will see the lower area which is for the Ash pit. the Coaling stage road has to be raised yet and I have to build the 16 bay coaling stage as well. 
With working out Goulburn Loco it has added a Few more Points, so far it has been 15 more Points to take the Total to 382 from 367 points.