Sunday, June 23, 2013

South Staging Back Tracks Installed.
 
Well the South Staging (Lower Staging) is starting to take shape with the Back 5 dead-end staging are in, but this staging is set up so that train back into the tracks ready to go again.

All the tracks in staging are already set up for track detection using a Gap Master which you can see in the photos they make it very easy to have the gaps.

Here the details for the Gap Masters i hope it help anyone that wants the information.
With the 5 tracks wired separately as well as the string of Points, this photo just shows the wiring for that section of the yard. I have not connected to the Yard feed yet in this Photo.

Servos installs, the things you learn.

As I have been using Servos with the Tam Valley Boards to control them, I have notice that I should have been doing the install a little different. I was installing them without a tube through the plywood deck so that the weather effected the ability of the servo by restricting the movement of the wire through the plywood. so more rework to be done again.
 In this Photo you can see the wire that is attached to the throw Bar of the Point, as you follow the wire back you can see the tube coming through the adjacent sleeper.
 in this photo you can just see the tube coming through the plywood above the servo having the tube may be a bit more work but a lot better operationally.
 Aside view of the servo the plywood and track bed and track
another view of the top on a different point. I will have to redo about 47 points oh fun. but in the long run it will be a better running layout.
 
Sorting Out Electrical Faults.
I have been having a few electrical problems with the layout and have done some modification to the way i had the layout wired.
Some of the rework is to update how i am doing my wiring.
1.had all dropper (wires from track to the main bus wire) the same colours (Red and Black) and started changing this only after a few months of starting the layout but never when back to do the rework.
Now.
 Main line droppers   :Red and Black.
Yard droppers           :White and Blue.
Servos droppers        :Yellow and Orange.
 All the Yard and Servo droppers go to plug to make it easier to drop out sections to find a fault.
With the wiring I have also made up some connection boards to make it easier as well as using boot lace crimps on the ends of the cables to to stop damage to the wires.
 The Boot Lace Crimps. I use different size crimps (note the colours are different) as can be seen going in to the plug in the photo above as well.
this is one of the Connection Boards I had made up, This one is for the servo feed cables. Since the cables do a loop it is so that both ends are connected to a single cable to the Boosters.
 

This is the Mainline Feeds the cables for the Main do the same as the Servo feed they loop but i have both upper level feeds going to the same booster.
The Main Line is split in to 4 sections 2 upper deck 2 lower deck. the Yard feeds do the same thing.

Sunday, November 18, 2012

November info

HI All

After having the N.M.R.A. Div 7 Meeting on the 10th November and going to the New England Convention in Armidale on the 17th & 18th November (which was a great convention) having people kept asking me to update this Blog so I am.

The Below 3 photos are of the Layout on the 16th November.
as you can see work is progressing well on Bethrunga Sprial now I have to make the trees for the top of the hill. I will have t go for another trip South to get more Soil for Junee as I have run out. so I will be getting more photos on the way.
 Mittigong track work is all laid now so some wiring and point motors and slide switches to go to get it operational.
 Glenlee has 80% track work done so I am hoping for my January C.C.W.N. Meeting to have the 2 finished.

On the way to Armidale for the New England Convention I went thru Werris Creek for a look.

8006 in Tuscan waiting its fate.

 
These 2 81's I with Kurt installed the ICE radio systems in both Loco's.
  Nice to see them out and about.
 
Need to come back and plan a Longer trip to so I can have a better look.
The EDI workshop. 
 

Wednesday, September 19, 2012

 More Photos of the Basic Scenicing that has been done so far.
Medway Junction

 Goulburn South Yard

Some updated Photos of some basic scenicing that has been started.


 Bethungra Sprial

 Medway Junction


Monday, December 5, 2011

Have to thank some people for helping with the layout later,
Ken Scales and Dennis Clarke with soldering all the dropper for the mainline to the main bus wire and the Yard feed in South Goulburn.
Gerry Hopkins for finding the cross wiring between to feeds that was done a while ago in North Goulburn after I was going nuts trying to find it.
Sam Mangion for getting the backdrops boards in and painted the base blue another job that now closes in each isle.
With all the guys help it has sorted out a few thing that i have been wanting to finish off and get to doing some operation.
I have been able to install TSU AT-1000 ALCO 251 V12 decoders in to 5 more 44class locos

Monday, October 17, 2011

Main Line in and running.
 All new Zonemaster Boosters are in, still working on finishing the last few main feeds for the track work to the boosters.
Have been building more point to back filling the rest of the layout starting with the last few points in Goulburn then on to Mittagong, Bethungra and Glenlee.
The backdrops for the bottom Half of the Layout are being done over the next 2 weekends then will be painted the Base sky colour I use which is Turbams North Bay
Now the NMRA convention tha was in Melbourne, is over and have learnt a lot of different options to doing things so I will be building some cardboard mock up. so to see how some of the building will look and if i have to shorten  the length of them to fit on the layout.
My Plan I hope, is to get in and try to finish of Goulburn get every thing working right and start to build its structures and scenery, so other work will slow or stop til I get this work done. 

Sunday, July 10, 2011

Have passed the hump! 210 out of 400 Points




Hi All
I have great news. I have now finished over 210 points last weekend, so I am over the hump.
Now I have all the points to finish the mainline which I will complete laying the track work this weekend. This makes me fell great for the time I have spent on the layout so far is paying off. I hope to have the all the mainline running by August.
Then I only have to worry about finishing the other 190 points which I would like to have finished by November 2012 so a lot of work to do better get back to it.

Wednesday, May 18, 2011

Central Coast Wednesday Night M.R.C. visit 18th may 2011

on the 18th May i had the Central Coast Wednesday Night M.R.C. attend which i am a member of. with myself there, there was 23 people attended. Most have see the layout before and were interested in the new work I have done. Some members got a change to operate a few trains around which also showed to me that the track work runs well, have a few small problems but over all the night went well. I would like to thanks Gerry Hopkins for assisting with rechecking all the points before the meeting.

Monday, May 9, 2011

Laying the Main Line on the bottom half of the layout

I have been working in to the track work to get the main line done over the last few months. This is the area from Goulburn South to Junee and the Southern Staging. I have the track done down to Bethungra. but still have to build another 26 points to finish the main line. Once the mainline is done i will start back filling the sidings as I build the rest of the points.

Having built 180 Points I had to buy a new Fast Tracks Pointform filling jig, due to wearing it done that far that it was no longer usable.
Now that I have had more track deliver I will get into finish the Main Line by mid June I hope.
I hope to add some photos soon.

Saturday, July 3, 2010

Finally i have updated the blog
















Hi All







Sorry all for not posting anything for many months but have been dealing with other things.
I have layed the main line from Moss Vale all the way to Sydney around the return loop and back it is nice to see trains run around the whole room.
The backing board for all the upper level are done.

The Bethungra Sprial tracks has been laid and is running,I now have to finish the main line form Goulburn south to Junne and back again only 60 more main line points to build.





Saturday, August 15, 2009

Flooring finished


The last major construction is Done.

with the floors now done I will be about to access all of the upper level easily.
The Floors are now all in heights inline with upper deck names as follows
Goulburn -Medway Ground Level,
Moss Vale Mittagong 6" high,
Picton - Maldon 10" High &
^ Glenlee -Sydney 18" High.
I hope to Add more shortly sorry I have Left it so Long.

Monday, June 15, 2009

Work done by the 10th June for a operational test.

For the 10th June I had a meeting at my place for the Location NMRA Members, the CCWN group (Centre Coast Wednesday Night Group) So I wanted the Layout Operation for the Meeting. I have to Thank Sam (my Father) Gerry, Ken and Trevor for the Help to get think done for the Night.


The work on the Goulburn south has been going well with the the first yard done. The Mainline south has been extended to the Points 2/3 of the way down the Goulburn South. the Coal storage roads have been install as well but the points to this area but the Slide switches were unable to be done for the Night so we used the front yard only.


The Photo Shows Area for Goulburn Loco has been worked out and the turntable is now in position with a 44 Class showing one of the storage roads. The Round house will only be the back half as I do not have the room for a Full Round house and also so it can be see and Operated from the front also you will see the lower area which is for the Ash pit. the Coaling stage road has to be raised yet and I have to build the 16 bay coaling stage as well.



Sam (My father) has been installing the slide switches in Medway Quarry and Goulburn South thanks Dad.
I had a friend Gerry come over and Help install the Point Motors control boards and decoders that run them We were only able to install the Control for Goulburn North and Medway for the 10th June which work great from the test, Thanks Gerry








Ken and Trevor Help with the wiring, They had the Thankless task of Connecting the dropper from the track work in Medway, Moss vale and Goulburn South to the to the Main and Yard Bus. thanks Guys.

One thing I will now be doing is changing the yard dropper wire colours form Red and Black (same as the Main line droppers) to White and Blue so not to get myself confused with the wiring.



Moss vale has now had all its Points install and the Mainline north in starting to go around to Mittagong.
5725 running Light in Moss Vale going back to Goulburn with a 44 Class following.

Saturday, May 16, 2009

Question on What is the White Stuff

The "White Stuff" is High Density Foam.
My Father "Sam" used foam underlay on his layout. It is very easy to use and not that costly, So I have done the same thing with the Main South Line layout.
The foam comes from Solartex Sales@solartex.com.au Sheets are 8' by 2' , but for transport they are cut down to 4' by 2' sheets. I cut them in to 1 & 1/2 " strips and sand the top two edges a little to remove the square corner look and make it easier to Ballast. I normal order 10 sheets at a time. Well back to work.

Saturday, May 9, 2009

May 09 South Goulburn started


Early May 2009 already the year is flying by.

I have started laying the foam underlay for Goulburn South track work. The hard part will be to Work out how to fit the 90Ft turntable and coaling stage (both to be built at a later date) in the space I have and still make it look like Goulburn Loco. I did not do the Loco yard on the plans as I was hoping to find some more space for the turntable. I have a Opening in to the workshop that will make it easier to fit the Turntable and Round House.
I have added a Copy of the original drawing of Goulburn Loco just to show how much I have to cut out to fit it in but i hope it still look good. The round house will not be a full one as in the drawing it just takes up to much room. Alot of the Duplicate track will go, one was to duel line to the round house from the station. The Coal stack roads there are 5 on the Plan, but I may only have 2but will still give the Idea of storage tracks.
I Hope to get Goulburn south track layed this month as well as finishing of Moss vale Track work.
We have been busy installing the ANE Point Servos to the Mainline Points and Slide Switches to the yards all of Goulburn North and Medway are done.
With working out Goulburn Loco it has added a Few more Points, so far it has been 15 more Points to take the Total to 382 from 367 points.



As the there will be more to add it looks like it may top the 400 Mark alot of points to build as I have Built 94 so far lots of work to do better get back to it.