I have been working in to the track work to get the main line done over the last few months. This is the area from Goulburn South to Junee and the Southern Staging. I have the track done down to Bethungra. but still have to build another 26 points to finish the main line. Once the mainline is done i will start back filling the sidings as I build the rest of the points.
Having built 180 Points I had to buy a new Fast Tracks Pointform filling jig, due to wearing it done that far that it was no longer usable.
Now that I have had more track deliver I will get into finish the Main Line by mid June I hope.
I hope to add some photos soon.
Monday, May 9, 2011
Saturday, July 3, 2010
Finally i have updated the blog
Sorry all for not posting anything for many months but have been dealing with other things.
I have layed the main line from Moss Vale all the way to Sydney around the return loop and back it is nice to see trains run around the whole room.
The backing board for all the upper level are done.
The Bethungra Sprial tracks has been laid and is running,I now have to finish the main line form Goulburn south to Junne and back again only 60 more main line points to build.
Saturday, August 15, 2009
Flooring finished

The last major construction is Done.
with the floors now done I will be about to access all of the upper level easily.
The Floors are now all in heights inline with upper deck names as follows
Goulburn -Medway Ground Level,
Moss Vale Mittagong 6" high,
I hope to Add more shortly sorry I have Left it so Long.
Monday, June 15, 2009
Work done by the 10th June for a operational test.
For the 10th June I had a meeting at my place for the Location NMRA Members, the CCWN group (Centre Coast Wednesday Night Group) So I wanted the Layout Operation for the Meeting. I have to Thank Sam (my Father) Gerry, Ken and Trevor for the Help to get think done for the Night.
The work on the Goulburn south has been going well with the the first yard done. The Mainline south has been extended to the Points 2/3 of the way down the Goulburn South. the Coal storage roads have been install as well but the points to this area but the Slide switches were unable to be done for the Night so we used the front yard only.
The Photo Shows Area for Goulburn Loco has been worked out and the turntable is now in position with a 44 Class showing one of the storage roads. The Round house will only be the back half as I do not have the room for a Full Round house and also so it can be see and Operated from the front also you will see the lower area which is for the Ash pit. the Coaling stage road has to be raised yet and I have to build the 16 bay coaling stage as well. Sam (My father) has been installing the slide switches in Medway Quarry and Goulburn South thanks Dad.
I had a friend Gerry come over and Help install the Point Motors control boards and decoders that run them We were only able to install the Control for Goulburn North and Medway for the 10th June which work great from the test, Thanks Gerry

Ken and Trevor Help with the wiring, They had the Thankless task of Connecting the dropper from the track work in Medway, Moss vale and Goulburn South to the to the Main and Yard Bus. thanks Guys.
One thing I will now be doing is changing the yard dropper wire colours form Red and Black (same as the Main line droppers) to White and Blue so not to get myself confused with the wiring.
Moss vale has now had all its Points install and the Mainline north in starting to go around to Mittagong.
5725 running Light in Moss Vale going back to Goulburn with a 44 Class following.
Saturday, May 16, 2009
Question on What is the White Stuff
The "White Stuff" is High Density Foam.
My Father "Sam" used foam underlay on his layout. It is very easy to use and not that costly, So I have done the same thing with the Main South Line layout.
The foam comes from Solartex Sales@solartex.com.au Sheets are 8' by 2' , but for transport they are cut down to 4' by 2' sheets. I cut them in to 1 & 1/2 " strips and sand the top two edges a little to remove the square corner look and make it easier to Ballast. I normal order 10 sheets at a time. Well back to work.
My Father "Sam" used foam underlay on his layout. It is very easy to use and not that costly, So I have done the same thing with the Main South Line layout.
The foam comes from Solartex Sales@solartex.com.au Sheets are 8' by 2' , but for transport they are cut down to 4' by 2' sheets. I cut them in to 1 & 1/2 " strips and sand the top two edges a little to remove the square corner look and make it easier to Ballast. I normal order 10 sheets at a time. Well back to work.
Saturday, May 9, 2009
May 09 South Goulburn started
Early May 2009 already the year is flying by.
I have started laying the foam underlay for Goulburn South track work. The hard part will be to Work out how to fit the 90Ft turntable and coaling stage (both to be built at a later date) in the space I have and still make it look like Goulburn Loco. I did not do the Loco yard on the plans as I was hoping to find some more space for the turntable. I have a Opening in to the workshop that will make it easier to fit the Turntable and Round House.
I have added a Copy of the original drawing of Goulburn Loco just to show how much I have to cut out to fit it in but i hope it still look good. The round house will not be a full one as in the drawing it just takes up to much room. Alot of the Duplicate track will go, one was to duel line to the round house from the station. The Coal stack roads there are 5 on the Plan, but I may only have 2but will still give the Idea of storage tracks.
I Hope to get Goulburn south track layed this month as well as finishing of Moss vale Track work.
We have been busy installing the ANE Point Servos to the Mainline Points and Slide Switches to the yards all of Goulburn North and Medway are done.
With working out Goulburn Loco it has added a Few more Points, so far it has been 15 more Points to take the Total to 382 from 367 points.As the there will be more to add it looks like it may top the 400 Mark alot of points to build as I have Built 94 so far lots of work to do better get back to it.
Friday, May 1, 2009
April was a slow month.
April has been a slow month having had lots to do away from the layout.
Have started laying the sleeper under the Points which does take a bit of time per point. I used match sticks, once they are painted and ballasted it is hard to tell.
With some sleeper laid I did a test with what colour to paint the sleepers and rail. the colours I have used are from "Floquil" Sleeps are "Railroad Tie Brown" and the Rail is "Rust". the Sleepers are spray painted but the rail are paint witha brush. I was happy with the colours that I done and it matched the photos I have taken at Goulburn Last year.
I have tried ballasting some of the yard at Goulburn North going off the photos I have, It look good. The Yard Ballast is Sieved down 1/4 minus from the local nursery. The large mainline ballast also comes from the same 1/4 Minus but sieved with a slightly larger holed sieve.
The 1/4 minus is $22.50 per bobcat bucket 2 fill the box trailer cheap ballast.
Subscribe to:
Posts (Atom)

