Servos installs, the things you learn.

As I have been using Servos with the Tam Valley Boards to control them, I have notice that I should have been doing the install a little different. I was installing them without a tube through the plywood deck so that the weather effected the ability of the servo by restricting the movement of the wire through the plywood. so more rework to be done again.
 In this Photo you can see the wire that is attached to the throw Bar of the Point, as you follow the wire back you can see the tube coming through the adjacent sleeper.
 in this photo you can just see the tube coming through the plywood above the servo having the tube may be a bit more work but a lot better operationally.
 Aside view of the servo the plywood and track bed and track
another view of the top on a different point. I will have to redo about 47 points oh fun. but in the long run it will be a better running layout.
 
Sorting Out Electrical Faults.
I have been having a few electrical problems with the layout and have done some modification to the way i had the layout wired.
Some of the rework is to update how i am doing my wiring.
1.had all dropper (wires from track to the main bus wire) the same colours (Red and Black) and started changing this only after a few months of starting the layout but never when back to do the rework.
Now.
 Main line droppers   :Red and Black.
Yard droppers           :White and Blue.
Servos droppers        :Yellow and Orange.
 All the Yard and Servo droppers go to plug to make it easier to drop out sections to find a fault.
With the wiring I have also made up some connection boards to make it easier as well as using boot lace crimps on the ends of the cables to to stop damage to the wires.
 The Boot Lace Crimps. I use different size crimps (note the colours are different) as can be seen going in to the plug in the photo above as well.
this is one of the Connection Boards I had made up, This one is for the servo feed cables. Since the cables do a loop it is so that both ends are connected to a single cable to the Boosters.
 

This is the Mainline Feeds the cables for the Main do the same as the Servo feed they loop but i have both upper level feeds going to the same booster.
The Main Line is split in to 4 sections 2 upper deck 2 lower deck. the Yard feeds do the same thing.

Sunday, November 18, 2012

November info

HI All

After having the N.M.R.A. Div 7 Meeting on the 10th November and going to the New England Convention in Armidale on the 17th & 18th November (which was a great convention) having people kept asking me to update this Blog so I am.

The Below 3 photos are of the Layout on the 16th November.
as you can see work is progressing well on Bethrunga Sprial now I have to make the trees for the top of the hill. I will have t go for another trip South to get more Soil for Junee as I have run out. so I will be getting more photos on the way.
 Mittigong track work is all laid now so some wiring and point motors and slide switches to go to get it operational.
 Glenlee has 80% track work done so I am hoping for my January C.C.W.N. Meeting to have the 2 finished.

On the way to Armidale for the New England Convention I went thru Werris Creek for a look.

8006 in Tuscan waiting its fate.

 
These 2 81's I with Kurt installed the ICE radio systems in both Loco's.
  Nice to see them out and about.
 
Need to come back and plan a Longer trip to so I can have a better look.
The EDI workshop. 
 

Wednesday, September 19, 2012

 More Photos of the Basic Scenicing that has been done so far.
Medway Junction

 Goulburn South Yard

Some updated Photos of some basic scenicing that has been started.


 Bethungra Sprial

 Medway Junction


Monday, December 5, 2011

Have to thank some people for helping with the layout later,
Ken Scales and Dennis Clarke with soldering all the dropper for the mainline to the main bus wire and the Yard feed in South Goulburn.
Gerry Hopkins for finding the cross wiring between to feeds that was done a while ago in North Goulburn after I was going nuts trying to find it.
Sam Mangion for getting the backdrops boards in and painted the base blue another job that now closes in each isle.
With all the guys help it has sorted out a few thing that i have been wanting to finish off and get to doing some operation.
I have been able to install TSU AT-1000 ALCO 251 V12 decoders in to 5 more 44class locos

Monday, October 17, 2011

Main Line in and running.
 All new Zonemaster Boosters are in, still working on finishing the last few main feeds for the track work to the boosters.
Have been building more point to back filling the rest of the layout starting with the last few points in Goulburn then on to Mittagong, Bethungra and Glenlee.
The backdrops for the bottom Half of the Layout are being done over the next 2 weekends then will be painted the Base sky colour I use which is Turbams North Bay
Now the NMRA convention tha was in Melbourne, is over and have learnt a lot of different options to doing things so I will be building some cardboard mock up. so to see how some of the building will look and if i have to shorten  the length of them to fit on the layout.
My Plan I hope, is to get in and try to finish of Goulburn get every thing working right and start to build its structures and scenery, so other work will slow or stop til I get this work done.