This Month we (My father Sam and Me) have been able to build all the rest of the frame work for the Layout the only thing left to do is build the ends of the peninsula upper deck on 3 and both decks on peninsula 2 (bottom will be Bethungra Spiral).
All he track work in "Goulburn North" is down ready to be wired up and have the point motors on the Main line and the slide switches on the rest.
All the point for "Moss Vale" have been made ready to be installed. I have run out of rail joiners again so I only have able a 3rd of "Moss Vale"track laid so far this month.
With "Moss Vale" started and the framework now done I am starting to build the 13 points for Mittagong I am waiting on a order of Foam underlay so I can continue laying track in Mittagong and start South Goulburn as well.
Now that the Main construction is done the whole room was vacuumed to remove all the dust and saw dust from the place its nice to have a clean layout room.
I have to thank My Father Sam for all the Help with the design and building the Layout so far I would not have been able to do it this fast (remember the Layout was started April 2008) or this well designed(eg the way the upper deck is counterlevered) without him thanks Dad. he has his own layout at his Place call "Buff Point Branch" check out the link to have alook at his hand work. http://www.nmra.org.au/Layout_Tours/Sam%20Mangion/indexB.html
Monday, March 23, 2009
Tuesday, February 10, 2009
Early Feb Works
The Hidden staging return loop is in, as well as the frame work for the whole wall. 
The Frame work for the 3rd peninsulas
has been started (in the 2nd photo) so we can get the levels right on the back wall. You can see the Bottom deck frame work along the wall in the Photo,
The stack of light fitting on the 2nd
Peninsulas are waiting for the pelmet timbers to go up to be install. It is fun how you can start to run out of room in such a large shed. this Photo is from inside the return loops as you can see the Sydney loop at the top of the 3rd Photo.
4th Photo, Looking form beside the 1st Peninsulas at the 2nd and 3rd.
The stack of light fitting on the 2nd
4th Photo, Looking form beside the 1st Peninsulas at the 2nd and 3rd.
Monday, January 19, 2009
January Work
This Photo Show the Difference in hight between the Decks
, Top Deck at Sydney is 76", The Middle Deck Goulburn South is 56" & the
Bottom Deck Hidden Staged is 36" there will be a Return Loop on the Bottom Deck for continues
running.
M
oss Vale foam underlay is down ready to have the Track and Points layed, just have to build 28 more Points to continue the track work.

DCC Control has been Connected to the Mainline.
Three 44 Class (4429,4480,4494) have done the Honours of being the first Locos to run on the Mainline from Goulburn to Medway towing the Cleaning Tanker.
First steam Loco on the Layout was 5725 to test the Track work and Points, She did not have a problem at all which is a great start.
Slide Switches have been install to move the Points on the Layouts Yards.
All Mainline Points will be Powered with Servos.

Bottom Deck Hidden Staged is 36" there will be a Return Loop on the Bottom Deck for continues
running.
M
DCC Control has been Connected to the Mainline.
Three 44 Class (4429,4480,4494) have done the Honours of being the first Locos to run on the Mainline from Goulburn to Medway towing the Cleaning Tanker.
First steam Loco on the Layout was 5725 to test the Track work and Points, She did not have a problem at all which is a great start.
Slide Switches have been install to move the Points on the Layouts Yards.
All Mainline Points will be Powered with Servos.
Tuesday, December 9, 2008
Some of Latest Pictures of the Layout

Picture 1 Northern end of Goulburn
Picture 2 Looking at where Junee Station will be (Lower Deck) under Medway Junction (Upper Deck).
Picture 3 Junee Loco (Lower Deck) will be under Goulburn Station (Upper Deck).
Picture 4 Medway Junction.
Picture 5 The Upper Deck here will be Goulburn South. the Lower Deck will be Hidden staging.
Work So Far
Picture 1 shows How the Layout Steps Down the Peninsula.
Picture 2 Upper Deck Plan Part 1 Sydney End.
Picture 3 Upper Deck Plan Part 2 Goulburn End.
Main South Line - New South Wales, Australia
HO by Rowan Mangion
Name: Main South Line
Operator: New South Wales Government Railways
Period: 1950's-1970's
Location: Upper Deck - Sydney to Goulburn
Lower Deck - Goulburn to Junee, Plus Hidden Staging
Train Room: Started January 2008
Layout Started April 2008
Work so far: Had to extend and insulate the shed first as well as add a workshop.
Train Room: Started January 2008
Layout Started April 2008
Work so far: Had to extend and insulate the shed first as well as add a workshop.
Started construction of the frame work of the Layout in April 2008
in the Corner Where Goulburn and Junee then built out from there.
in the Corner Where Goulburn and Junee then built out from there.
Started laying the under lay at the northern end of Goulburn through to Medway
Junction May 2008.
Track Laying started in July 2008
Have lay most of the Track in Station End of Goulburn and Medway Junction
and working around the Peninsula to Moss Vale .
SPECIFICATIONS
DCC System: EasyDCC from CVP
Dual Deck: 20" between Decks
Track: Micro Engineering code 70
All Points (Turnouts): Fast tracks number 6
Number of Points (Turnouts): 365 to build, 70 built so far
Point Motors: Mainline only
Curvature radius: Main line 30" & 28" siding Minimum 24"
Gradient: Mainly 2.5%
Layout Size: 31ft X 30ft with 3 dual deck peninsulas
Deck height
Lower Deck Starting at 36" at Hidden staging and Junee working it up to the Mid High of 56" at Goulburn them up to top staging (Sydney) at 76".
SPECIFICATIONS
DCC System: EasyDCC from CVP
Dual Deck: 20" between Decks
Track: Micro Engineering code 70
All Points (Turnouts): Fast tracks number 6
Number of Points (Turnouts): 365 to build, 70 built so far
Point Motors: Mainline only
Curvature radius: Main line 30" & 28" siding Minimum 24"
Gradient: Mainly 2.5%
Layout Size: 31ft X 30ft with 3 dual deck peninsulas
Deck height
Lower Deck Starting at 36" at Hidden staging and Junee working it up to the Mid High of 56" at Goulburn them up to top staging (Sydney) at 76".