Sunday, July 10, 2011

Have passed the hump! 210 out of 400 Points




Hi All
I have great news. I have now finished over 210 points last weekend, so I am over the hump.
Now I have all the points to finish the mainline which I will complete laying the track work this weekend. This makes me fell great for the time I have spent on the layout so far is paying off. I hope to have the all the mainline running by August.
Then I only have to worry about finishing the other 190 points which I would like to have finished by November 2012 so a lot of work to do better get back to it.

Wednesday, May 18, 2011

Central Coast Wednesday Night M.R.C. visit 18th may 2011

on the 18th May i had the Central Coast Wednesday Night M.R.C. attend which i am a member of. with myself there, there was 23 people attended. Most have see the layout before and were interested in the new work I have done. Some members got a change to operate a few trains around which also showed to me that the track work runs well, have a few small problems but over all the night went well. I would like to thanks Gerry Hopkins for assisting with rechecking all the points before the meeting.

Monday, May 9, 2011

Laying the Main Line on the bottom half of the layout

I have been working in to the track work to get the main line done over the last few months. This is the area from Goulburn South to Junee and the Southern Staging. I have the track done down to Bethungra. but still have to build another 26 points to finish the main line. Once the mainline is done i will start back filling the sidings as I build the rest of the points.

Having built 180 Points I had to buy a new Fast Tracks Pointform filling jig, due to wearing it done that far that it was no longer usable.
Now that I have had more track deliver I will get into finish the Main Line by mid June I hope.
I hope to add some photos soon.

Saturday, July 3, 2010

Finally i have updated the blog
















Hi All







Sorry all for not posting anything for many months but have been dealing with other things.
I have layed the main line from Moss Vale all the way to Sydney around the return loop and back it is nice to see trains run around the whole room.
The backing board for all the upper level are done.

The Bethungra Sprial tracks has been laid and is running,I now have to finish the main line form Goulburn south to Junne and back again only 60 more main line points to build.





Saturday, August 15, 2009

Flooring finished


The last major construction is Done.

with the floors now done I will be about to access all of the upper level easily.
The Floors are now all in heights inline with upper deck names as follows
Goulburn -Medway Ground Level,
Moss Vale Mittagong 6" high,
Picton - Maldon 10" High &
^ Glenlee -Sydney 18" High.
I hope to Add more shortly sorry I have Left it so Long.

Monday, June 15, 2009

Work done by the 10th June for a operational test.

For the 10th June I had a meeting at my place for the Location NMRA Members, the CCWN group (Centre Coast Wednesday Night Group) So I wanted the Layout Operation for the Meeting. I have to Thank Sam (my Father) Gerry, Ken and Trevor for the Help to get think done for the Night.


The work on the Goulburn south has been going well with the the first yard done. The Mainline south has been extended to the Points 2/3 of the way down the Goulburn South. the Coal storage roads have been install as well but the points to this area but the Slide switches were unable to be done for the Night so we used the front yard only.


The Photo Shows Area for Goulburn Loco has been worked out and the turntable is now in position with a 44 Class showing one of the storage roads. The Round house will only be the back half as I do not have the room for a Full Round house and also so it can be see and Operated from the front also you will see the lower area which is for the Ash pit. the Coaling stage road has to be raised yet and I have to build the 16 bay coaling stage as well.



Sam (My father) has been installing the slide switches in Medway Quarry and Goulburn South thanks Dad.
I had a friend Gerry come over and Help install the Point Motors control boards and decoders that run them We were only able to install the Control for Goulburn North and Medway for the 10th June which work great from the test, Thanks Gerry








Ken and Trevor Help with the wiring, They had the Thankless task of Connecting the dropper from the track work in Medway, Moss vale and Goulburn South to the to the Main and Yard Bus. thanks Guys.

One thing I will now be doing is changing the yard dropper wire colours form Red and Black (same as the Main line droppers) to White and Blue so not to get myself confused with the wiring.



Moss vale has now had all its Points install and the Mainline north in starting to go around to Mittagong.
5725 running Light in Moss Vale going back to Goulburn with a 44 Class following.

Saturday, May 16, 2009

Question on What is the White Stuff

The "White Stuff" is High Density Foam.
My Father "Sam" used foam underlay on his layout. It is very easy to use and not that costly, So I have done the same thing with the Main South Line layout.
The foam comes from Solartex Sales@solartex.com.au Sheets are 8' by 2' , but for transport they are cut down to 4' by 2' sheets. I cut them in to 1 & 1/2 " strips and sand the top two edges a little to remove the square corner look and make it easier to Ballast. I normal order 10 sheets at a time. Well back to work.