This Photo Show the Difference in hight between the Decks, Top Deck at Sydney is 76", The Middle Deck Goulburn South is 56" & the
Bottom Deck Hidden Staged is 36" there will be a Return Loop on the Bottom Deck for continues
running.
Moss Vale foam underlay is down ready to have the Track and Points layed, just have to build 28 more Points to continue the track work.
DCC Control has been Connected to the Mainline.
Three 44 Class (4429,4480,4494) have done the Honours of being the first Locos to run on the Mainline from Goulburn to Medway towing the Cleaning Tanker.
First steam Loco on the Layout was 5725 to test the Track work and Points, She did not have a problem at all which is a great start.
Slide Switches have been install to move the Points on the Layouts Yards.
All Mainline Points will be Powered with Servos.
Bottom Deck Hidden Staged is 36" there will be a Return Loop on the Bottom Deck for continues
running.
Moss Vale foam underlay is down ready to have the Track and Points layed, just have to build 28 more Points to continue the track work.
DCC Control has been Connected to the Mainline.
Three 44 Class (4429,4480,4494) have done the Honours of being the first Locos to run on the Mainline from Goulburn to Medway towing the Cleaning Tanker.
First steam Loco on the Layout was 5725 to test the Track work and Points, She did not have a problem at all which is a great start.
Slide Switches have been install to move the Points on the Layouts Yards.
All Mainline Points will be Powered with Servos.
1 comment:
Fabulous work, Rowan.
Are you in the Sydney area? Any chance I could pop by for a look-see when I'm in NSW in April?
I'm especially interested in your point mechanisms shown for your yard layout. Any chance of seeing some close-up views of those?
Some inspiring modeling going on there. Keep it up!
--b kooistra
Post a Comment