The last major construction is Done.
with the floors now done I will be about to access all of the upper level easily.
The Floors are now all in heights inline with upper deck names as follows
Goulburn -Medway Ground Level,
Moss Vale Mittagong 6" high,
I hope to Add more shortly sorry I have Left it so Long.
No comments:
Post a Comment